Getting started¶
Also in the app
Press ? in Fab Dispatch to read this in the help center, or / to ask the assistant.
Fab Dispatch decides which equipment engineer goes to which tool-down or preventive maintenance (PM) job during a shift, and shows you why. It solves the same shift with five strategies side by side and recommends one.
What you see first¶
The Overview opens on a generated shift for your fab: engineers with certifications, and the jobs that will arrive over the shift. All five strategies solve it in parallel, and the top card names the recommended plan with the reason in one sentence.
Your first five minutes¶
- Read the recommendation card, then look at the cost × latency chart beneath it. The orange point is the recommended plan.
- Open Floor plan and click any job to see who each strategy sent, and why.
- In the left panel, drag a cost weight (for example Walking). Every strategy re-solves.
- Pick another preset (for example Lithography crunch) and click Generate shift.
- If you're a dispatcher, open Live dispatch and click Start live shift to run it in real time.
Getting help¶
- Press ? anywhere to open this help center, or / to ask the assistant.
- Look for the ⓘ next to a control for help on just that control.
- Take the tour in the help menu replays the first-run walkthrough.